Where it is going

A layer that will be compacted goes down thicker than it ends up. How much more to order depends on the material and the plate; ask the supplier, and put their figure in. It starts at nothing rather than at a guess.

The material

The densities in the list are typical loose figures, and the same stone weighs more wet than dry and more graded than single-sized. The figure on the supplier’s ticket is the one to use. Bark and compost are usually sold by the litre: choose “volume”.

How much

The working


    
How it works

GRAVEL works out how much gravel, sand, sub-base, topsoil or bark a job needs: the volume from the area and the depth, the weight from the bulk density, and the number of bulk or small bags. The densities offered are typical loose figures and say so; the supplier's figure is the one to use. The measurements stay in this tab.

Questions people ask about GRAVEL

How much gravel do I need?

Multiply the area by the depth to get the volume, then by the bulk density to get the weight. A 6 × 3 m drive at 50 mm is 18 × 0.05 = 0.9 m³; at a typical 1.6 tonnes a cubic metre that is 1.44 tonnes, or two 850 kg bulk bags.

How much does a cubic metre of gravel weigh?

Typically 1.5 to 1.7 tonnes loose, but it depends on the stone, its size and grading, and how wet it is. A crushed sub-base such as MOT Type 1 is heavier, around 2.0 to 2.2 tonnes, and topsoil lighter. The supplier’s ticket gives the figure for the load you are buying; put it in and the weight follows.

How do I convert cubic metres to cubic yards?

Divide by 0.764555. A yard is 0.9144 m exactly, so a cubic yard is 0.9144 cubed, 0.764554857984 m³. The page gives both, and US tons of 2,000 lb beside tonnes.

Should I order extra for compaction?

For a sub-base that will be compacted, yes: it goes down thicker than it ends. How much more depends on the material and the compactor, so the page starts at nothing and takes the supplier’s or your engineer’s figure rather than inventing one.