Where it is going

A layer that will be compacted goes down thicker than it ends up. How much more to order depends on the material and the plate; ask the supplier, and put their figure in. It starts at nothing rather than at a guess.

The material

The densities in the list are typical loose figures, and the same stone weighs more wet than dry and more graded than single-sized. The figure on the supplier’s ticket is the one to use. Bark and compost are usually sold by the litre: choose “volume”.

How much

The working


    
How it works

GRAVEL works out how much gravel, sand, sub-base, topsoil or bark a job needs: the volume from the area and the depth, the weight from the bulk density, and the number of bulk or small bags. The densities offered are typical loose figures and say so; the supplier's figure is the one to use. The measurements stay in this tab.

Doing this often? Foundry, the Engineering Suite's drawing half draws the area to scale and measures it off the drawing, holes taken away. On its own, US$2 a month; with everything else, US$5 a month or US$48 a year. 7 days free.